CULPEPER MIDDLE SCHOOL – ROOF REPLACEMENT

Replacement of existing asphalt roofing with new single-ply TPO membrane roof.

Status

Accepting Bids

Prebid Date11/29/22 1:00pm

Bid Date12/13/22 2:00pm

Company

Spectrum Design

Location

14300 Achievement Dr, Culpeper, VA 22701

The School Board of Culpeper County, Virginia will receive sealed Bids for CULPEPER MIDDLE SCHOOL – ROOF REPLACEMENT, 14300 Achievement Dr, Culpeper, VA 22701. IFB No.: 22-11-05

DESCRIPTION OF WORK: Replacement of existing asphalt roofing with new single-ply TPO membrane roof.

Bids shall be prepared on a single-prime, lump sum basis. Bids will be received until 2:00 PM local time on Tuesday, December 13, 2022 at the Culpeper County Schools Administration Office, 471 James Madison Hwy, Culpeper, Virginia 22701. Bids will be opened and read aloud.

Bidders and other interested parties may purchase complete sets of Bidding Documents (electronic and/or hard copy) from TRASCO www.trascoplanroom.com (540) 345-1533.

A Pre-Bid Meeting will be held at Culpeper Middle School on Tuesday November 29, 2022 at 1:00 PM.

Bidding Documents (Drawings and Project Manual) may be examined at McGraw Hill Dodge.

BID SECURITY: Each Contractor must submit, with the Bid Documents, a bid security in the amount of five (5) percent of the bid as described in the Instructions of Bidders. The successful Contractors will be required to furnish and pay for performance and payment bonds from a bonding company licensed in the Commonwealth of Virginia as described in the Instructions to Bidders.

The attention of each Bidder is directed to Title 54.1 of Chapter 11, Code of Virginia, pertaining to registration.

All Bids shall remain valid for a period of thirty (30) days after the scheduled bid due date. Withdrawal of bids due to error shall be in accordance with Section 2.2-4330, Code of Virginia.

The Owner reserves the right to reject any or all Bids, to waive informalities or irregularities in the bids received, to accept the Bid deemed to be in the best interest of the Owner, and to negotiate with the apparent low bidder should the lowest responsive and responsible bid exceed the funds available for the project.