Pound Water System Rehab Pilkenton Peak and Highland Avenue Project

The project consists of installation/replacement of approximately 4288 LF of 10” waterline, 279 LF of 8” waterline, 7420 LF of 6” waterline, 3405 LF of 4” waterline, 2000 LF of 2” waterline, 625 LF 1” waterline, 4530 LF 3/4” waterline, 30 LF of 20” steel casing, 280 LF of 16” steel casing, 55 LF of 12” steel casing, 30 LF of 8” steel casing, 61 meter reconnections, four (4) fire hydrant assemblies, one (1) pressure sustaining valve, one (1) pressure reducing valve, nine (9) blow-off valve assemblies, 135 LF of concrete encasement, and associated waterline appurtenances.