Dry Fork Waterline and Pump Station Upgrades, Contract II for the Buchanan County PSA
This project consists of replacement of the Line 100W PRV Vault including but not limited to vault with 2 – 12 inch PRVs, 1 – 4 inch PRV, and 1 – 6 inch relief valve and SCADA systems, rehabilitation of the Dry fork PRV vault including but not limited to 1 – 12 inch PRV, 1 – 4 inch PRV, and 1 – 8 inch relief valve, electrical upgrades to the Dry Fork No. 1 pump station including but not limited to an 80KW portable generator and manual transfer switch, upgrades to the Dry Fork No. 2 pump station including but not limited to three (3) hydropneumatics tanks, new variable frequency drive starters, a 20KW portable generator and a manual transfer switch, along with all related appurtenances.
Drawings
(click to expand/collapse)

Name | Size | ||
Dry Fork PRV Contract 2 - Issued for Bid 3-28-25 | 26.5 MB |