Off-Site Infrastructure for Proposed Project Jonah
Contract I: Water infrastructure improvements include construction of a new 10-inch water line and appurtenances to connect the existing water system and a service meter and valve vault to serve the fishery. Contract II: Water infrastructure improvement includes upgrades at three existing water pump stations. Contract III: Sewer infrastructure improvements include construction of a new sewage lift station to serve the new fishery, a new underground stormwater detention system, a new 6-inch force main and appurtenances to connect the new lift station to an existing influent lift station which conveys sewage to the existing sewage treatment plant, and upgrades at the existing influent lift station.
Plan Holders
| Date | Company | Contact |
| 10/27/25 1:38 pm |
DCI/SHIRES INC
2980 Big Laurel Highway
Suite 7B Bluefield, WV 24701 |
Denise Braun
Field Office Assistant
Tel: 304-323-1996
Fax: 304-332-3037
|
| 10/30/25 1:04 pm |
Dodge Data & Analytics
2860 South State Hwy 161
Suite 160 #501 Grand Prarie, TX 75052 |
Jayalakshmi Loganathan
Tel: 413-376-7032
|
| 10/28/25 11:27 am |
EMATS, INC
480 Claypool Hill Mall Road, Cedar Bluff, VA, USA
Cedar Bluff, VA 24609 |
Jon Bowerbank
President
Tel: 276-970-6550
|
| 10/28/25 7:52 am |
Frizzell Construction Co.
1501 Bluff City Hwy.
Bristol, TN 37620 |
Frank Whitt
Project Manager
Tel: 4237645107
Fax: 423-968-7315
|
| 10/28/25 12:22 pm |
King General Contractors
250 Bob Morrison Blvd
Bristol, TN 24201 |
Cindy Carrier
Office Manager
Tel: 276-644-1585
Fax: 276-644-1586
|
| 10/27/25 10:39 am |
Orders Construction Co., Inc.
P. O. Box 1448
501 6th Ave. St. Albans, WV 25177 |
John Persun, Jr.
Vice President Utility Division
Tel: 304-722-4237
Fax: 304-201-2405
|
