Off-Site Infrastructure for Proposed Project Jonah

Contract I: Water infrastructure improvements include construction of a new 10-inch water line and appurtenances to connect the existing water system and a service meter and valve vault to serve the fishery. Contract II: Water infrastructure improvement includes upgrades at three existing water pump stations. Contract III: Sewer infrastructure improvements include construction of a new sewage lift station to serve the new fishery, a new underground stormwater detention system, a new 6-inch force main and appurtenances to connect the new lift station to an existing influent lift station which conveys sewage to the existing sewage treatment plant, and upgrades at the existing influent lift station.
Date Company Contact
1761572299
10/27/25 1:38 pm
DCI/SHIRES INC
2980 Big Laurel Highway
Suite 7B
Bluefield, WV 24701
Denise Braun
Field Office Assistant
Tel: 304-323-1996
Fax: 304-332-3037
1761829458
10/30/25 1:04 pm
Dodge Data & Analytics
2860 South State Hwy 161
Suite 160 #501
Grand Prarie, TX 75052
Jayalakshmi Loganathan
Tel: 413-376-7032
1761650843
10/28/25 11:27 am
EMATS, INC
480 Claypool Hill Mall Road, Cedar Bluff, VA, USA
Cedar Bluff, VA 24609
Jon Bowerbank
President
Tel: 276-970-6550
1761637920
10/28/25 7:52 am
Frizzell Construction Co.
1501 Bluff City Hwy.
Bristol, TN 37620
Frank Whitt
Project Manager
Tel: 4237645107
Fax: 423-968-7315
1761654134
10/28/25 12:22 pm
King General Contractors
250 Bob Morrison Blvd
Bristol, TN 24201
Cindy Carrier
Office Manager
Tel: 276-644-1585
Fax: 276-644-1586
1761561557
10/27/25 10:39 am
Orders Construction Co., Inc.
P. O. Box 1448
501 6th Ave.
St. Albans, WV 25177
John Persun, Jr.
Vice President Utility Division
Tel: 304-722-4237
Fax: 304-201-2405