Off-Site Infrastructure for Proposed Project Jonah for the Tazewell County PSA
This project consists of the following: Contract I: Water infrastructure improvements include construction of a new 10-inch water line and appurtenances to connect the existing water system and a service meter and valve vault to serve the fishery. Contract II: Water infrastructure improvement includes upgrades at three existing water pump stations. Contract III: Sewer infrastructure improvements include construction of a new sewage lift station to serve the new fishery, a new underground detention system, a new 6-inch force main and appurtenances to connect the new lift station to an existing influent life station which conveys sewage to the existing sewage treatment plant, and upgrades at the existing influent lift station.
Drawings
(click to expand/collapse)

Name | Size | ||
16129 Off-Site Infrastructure for Proposed Project Jonah - Plans 06-27-25 | 536.7 MB |