Riverview Sewer Extension Project – Phase I
The project consists of installation of approximately 618 L.F of 8” sewer line, 400 L.F. of 6” sewer line, 1000 L.F. of 4” sewer line, three (3) manholes, one (1) connection to existing manhole, three (3) septic tank pump out and cave in, (23) new customer connections, 140 S.Y. of paving and associated sewer line appurtenances.
Drawings
(click to expand/collapse)

Name | Size | ||
Plans - Riverview Sewer Design | 15.1 MB |