Bids Due in 15 days
9/30/25 2:00pm
Electronic bidding
Water Treatment Plant Electrical Upgrades for the Wise County PSA
Bids Due in 15 days
Thompson & Litton
5622 Industrial Park Road, Norton, VA 24273
This project consists of the replacement of multiple electrical panels, Motor Control Center, starters, and transformer at the Wise County Water Treatment Plant located in Carfax, VA
Bidding Closed
9/8/25 10:00am
Fall 2025 Street Resurfacing Program - Lexington VA
Bidding Closed
City of Lexington, VA
890 Shop Road, Lexington, VA 24450
Mill, as required, and install 2” VDOT SM-9.5A surface asphalt on the roadways identified below. Contingency unit pricing is provided for any patching operations that may be required prior to final surface installation.
Bids Due in 8 days
9/23/25 3:00pm
Electronic bidding
Lexington Jordan’s Point Park
Bids Due in 8 days
AECOM
Jordan’s Point Park, Moses Mill Road, Lexington, VA 24450
Project consists of construction of precast concrete tiered seating, walkways, new gravel roadway, landscaping and picnic supply items.
Bids Due tomorrow at 2:00pm
9/16/25 2:00pm
Existing Water System Renovations for the Town of Pineville
Bids Due tomorrow at 2:00pm
Thompson & Litton, Inc.
75 Main Avenue, Pineville, WV 24874
Existing Water System Renovations for the Town of Pineville will be upgraded as follows: new radio read meters for all customers, New trailer and mini excavator, the repair or replace approximately 25 fire hydrants, install 4 master meters for water accountability, and the replacement of existing 6” line with new 10” line from downtown Pineville toward booster station site on WV Rt 97.
Bids Due in 2 days
9/17/25 3:00pm
SWVA Regional Readiness Center Modernization Interior Modifications, VAFM PN 23- 0006
Bids Due in 2 days
Spectrum Design
26502 Newbanks Road, Abingdon, VA
The project is generally described as renovation of approximately 52,800 SF of the Southwest Virginia Readiness Center to create new latrines and locker rooms, new classroom spaces, new kitchen and new exit corridors.