Bids due in 51 days
1/8/26 2:00pm
Wastewater CIP Inflow and Infiltration Project MS-7 Phase II
Bids due in 51 days
Thompson & Litton, Inc.
941 Fir St, Waynesboro, VA 22980
This project consists of the rehabilitation of approximately 2,020 linear feet (L.F.) of 8-inch and 240 L.F. of 10-inch sewer line with cured-in-place pipe liner; four point repairs; the rehabilitation of 12 manholes; the replacement of 11 manhole cones and frames and covers, the rehabilitation of approximately 960 L.F. of sewer laterals, and the installation of 28 cleanouts, reinstatement of 34 service connections, and all associated appurtenances.
Bids due in 16 days
12/4/25 1:30pm
Pocahontas Waterline Replacement Project for the Tazewell County PSA
Bids due in 16 days
Thompson & Litton, Inc.
168 Tazewell Mall Circle, Tazewell, Virginia 24651
This project consists of the replacement of existing waterlines in the Yards, Nemours, and Wolfe communities in Mercer County, West Virginia. In addition, the water lines will be upgraded to allow for the installation of fire hydrants. The Project consists of constructing: CONTRACT NO. 1 – will consist of approximately 12,750 L.F. of 8-inch water main, 13,700 L.F. of 6-inch water main, 3,900 L.F. of 2-inch water main, 3,000 L.F. of service lines, 104 Meters and Settings, 100 Service reconnections, 4 Service relocations, valves, hydrants, and all appurtenances. CONTRACT NO. 2 – will consist of approximately 8,800 L.F. of 8-inch water main, 11,300 L.F. of 6-inch water main, 8,600 L.F. of 4-inch water main, 4,600 L.F. of 2-inch water main, 3,300 L.F. of service lines, 49 Meters and Settings, 47 Service reconnections, 2 Service relocations, bridge modifications, valves, hydrants, and all appurtenances. CONTRACT NO. 3 – will consist of either the rehabilitation or replacement of a 250,000-gallon water storage tank (Yards Storage Tank) and all appurtenances. CONTRACT NO. 4 – will consist of either the rehabilitation or replacement of a 225,000-gallon water storage tank (Shop Hollow Storage Tank) and all appurtenances.
Bids due in 13 days
12/1/25 2:00pm
Electronic bidding
Off-Site Infrastructure for Proposed Project Jonah
Bids due in 13 days
Thompson & Litton
168 Tazewell Mall Circle, Tazewell, VA 24651
Contract I: Water infrastructure improvements include construction of a new 10-inch water line and appurtenances to connect the existing water system and a service meter and valve vault to serve the fishery. Contract II: Water infrastructure improvement includes upgrades at three existing water pump stations. Contract III: Sewer infrastructure improvements include construction of a new sewage lift station to serve the new fishery, a new underground stormwater detention system, a new 6-inch force main and appurtenances to connect the new lift station to an existing influent lift station which conveys sewage to the existing sewage treatment plant, and upgrades at the existing influent lift station.
Bids due in 57 days
1/14/26 2:00pm
Electronic bidding
The Woods Creek Stormwater BMP Pond
Bids due in 57 days
Civil Consulting Group, P.C.
890 Shop Road Lexington, VA 24450
The Woods Creek Stormwater BMP Pond which includes (all values are approximate) Stormwater management pond with approximately 100,000 cubic feet of internal storage, 200 linear feet stormdrain, 5 stormdrain structures, tree removal, rock removal, landscaping, testing during construction, restoration, appurtenances, erosion and sediment control, material export; material import; etc. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; reestablishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.